![]() | The TNG was completely pre-assembled in the Ansaldo workshop in Milano. Here the hydrostatic azimuth bearing formed by 24 oil pads. |
| The azimuth box is positioned on top of the hydrostatic bearing. | ![]() |
![]() | Mounting of the arms complete the fork structure. Declination motors are inserted in their housing, two for each arm. |
|
| Back to main page |
| Back to previous page |