![]() | Aluminizing operation have taken place at the UK William Herschel Telescope. Here the careful cleaning of M1. |
| After thorough drying the mirror is being lifted inside the tank. | ![]() |
![]() | Inside the tank a special support has been fixed to hold the convex bottom of the TNG primary mirror. |
| Positioning of the mirror inside the vacuum tank. | ![]() |
![]() | Aluminization has been completed. From left: Paolo Conconi, Piero Rafanelli, Dave Jackson. |
|
| Back to main page |
| Back to previous page |