Building


General Drawing and Layout
Construction Phases
Telescope Assembling
Conditioning System
Details of the Building
[INDEX]

Front view of the TNG dome during tests of the novel THK rotating device in July 1996. [TNG dome]
[The bridge] Access to the observing floor from the bridge is only possible by the back of the building by means of a projecting platform and sliding doors. Two small windows permit the view of the telescope without disturbing its environment.
Side view of the TNG building in winter. Snow on the mountain is common for short periods of time around January, but most of all ice that the wind builds up around every vertical object. [Side view]
[Telescope and dome] View of the telescope and dome as seen from the bridge. The annex building (lower right) is connected to the rotating dome via stairs and elevator set in the white structure.

Back to main page Back to previous page